Warning: call_user_func_array() expects parameter 1 to be a valid callback, no array or string given in /home/niclin17/sofloyachting.com/wp-includes/class-wp-hook.php on line 298
UPDATED with (video) – Broad Causeway drawbridge reopens after bridge span closed unexpectedly | SoFloYachting

Incidentally, the broad causeway, which is about 60 years old, is about to undergo a $13-million dollar rehab project which includes replacing parts of the draw bridge mechanism because of past electrical problems.

LINK

VIDEO

Credit: MIAMI (CBSMiami)

Leave a Reply